Boxes 100-103
| Box |
Photo Number |
Description |
| 100 |
0 |
Site of Blast Furnace #12, July 17, 1906 |
|
2 |
|
|
4 |
Excavation for Open Hearth from South, July 21, 1906 |
|
5 |
Bridge at Main Entrance to Plant Looking Towards Site of Main Office, July 21, 1906 |
|
6 |
Foundation for Blast Furnace No. 10, July 21, 1906 |
|
8 |
Building Sewer from South, July 21, 1906 |
|
9 |
Foundation of Blast Furnace #11, July 21, 1906 |
|
10 |
Foundation Blast Furnace #9, July 21, 1906 |
|
11 |
Site of Electric Station from South, July 21, 1906 |
| 100 |
12 |
Location of Slip from Lake, Looking South, August 3, 1906 |
|
14 |
|
|
16 |
Site of Storehouse and Brick Shed, August 3, 1906 |
|
17 |
Foundation of Blast Furnace, August 3, 1906 |
|
19 |
Foundation for Blast Furnace No. 11, August 3, 1906 |
|
20 |
Foundation of Blast Furnace No. #9 August 9, 1906 |
|
- |
Foundation for Blast Furnace #10, August 3, 1906 |
|
- |
Bridge to Main Entrance |
|
22 |
Foundation for Blast Furnace #12, August 23, 1906 |
|
24 |
Excavation for Foundation of Pumping Station, July 23, 1906 |
| 100 |
25 |
Fifth Avenue Looking West form S.E. Corner of Broadway, August 23, 1906 |
|
25A |
Corner of Broadway and Fifth Avenue as it Appeared, April 18, 1906 |
|
26 |
Starting the Breakwater Pier, August 23, 1906 |
|
27 |
Foundation for Warehouse and Brick Shed, August 3, 1906 |
|
- |
General Office, September 14, 1906 |
|
31 |
Laying Foundation for Machine Shop, September 17, 1906 |
|
32 |
General View from Point East of Furnace #12, Looking South, September 17, 1906 |
|
33 |
Building Breakwater for Piers; Furnace #12 in Background, September 17, 1906 |
|
35 |
Foundation for Warehouse and Brick Shed, September 17, 1906 |
|
36 |
Laying Sewer to Channel, September 17, 1906 |
| 100 |
40 |
Extending Piers for Main Channel Entrances, October 3, 1906 |
|
41 |
Foundation of Blast Furnace #12 and Cast House, October 3, 1906 |
|
42 |
Laying Concrete for Open Hearth #4, October 3, 1906 |
|
43 |
Filling in Around Office Building Foundation, Oct. 3, 1906 |
|
44 |
Laying Foundation for O.H. Sewer, Looking North, October 3, 1906 |
|
45 |
General View of Blast Furnace Foundations 9-10-11-12, October 3, 1906 |
|
47 |
Laying Foundation for Central Pumping Station, October 3, 1906 |
|
48 |
Laying Concrete Foundation for Stoves and Furnaces #11 and #12, October 22, 1906 |
|
49 |
Site of Pumping Station; Crib Work for Foundation, October 22, 1906 |
|
50 |
Carpenter Shop Foundation, October 22, 1906 |
|
51 |
Excavating Slip, Looking South from Lake End, October 22, 1906 |
| 100 |
52 |
Site of Machine Shop Erecting Steel Work, October 22, 1906 |
|
54 |
Laying Foundation for Open Hearth, October 22, 1906 |
|
55 |
Laying Concrete Sidewalks at Fifth and Broadway, October 22, 1906 |
|
56 |
Excavation for Ore Bin Foundations, October 22, 1906 |
|
57 |
Laying Foundation for Stoves 9 and 10, October 22, 1906 |
|
58 |
Building Slip, Looking North, November 2, 1906 |
|
59 |
Foundation of Stoves and Furnaces #11 and #12, November 2, 1906 |
|
60 |
Pumping Station Excavating, November 2, 1906 |
|
61 |
Foundation of Stoves for Furnaces #9 and #10, November 2, 1906 |
|
62 |
Tom Sewer. Bulkhead End of 96" Sewer at Channel Opening, November 2, 1906 |
| 100 |
63 |
18" Sewer Crossing Broadway in Alley 25, November 2, 1906 |
|
64 |
No. 2 Land Boring for Water Tunnel, November 2, 1906 |
|
65 |
Machine Shop, Erection of Steel Work, November 2, 1906 |
|
66 |
Building Slip, Looking Northeast, November 27, 1906 |
|
67 |
Laying Foundation for Ore Bins and Setting Skip Tanks, November 27, 1906 |
|
68 |
Pumping Station Excavation at Depth of 18 feet, November 27, 1906 |
|
69 |
Laying Sewer in Alley 26, November 27, 1906 |
|
70 |
Laying Water Pipes Across Broadway in Alley 25, November 27, 1906 |
|
71 |
Foundation of Stoves for Furnaces #11 and #12, November 27, 1906 |
|
72 |
Stove Foundation #9 and #10, November 27, 1906 |
|
73-G |
Forge Shop, North, 2000 Ton Press Foundation, American Bridge Co., April 29, 1918 |
| 100 |
74 |
Excavation for Electric Station, November 27, 1906 |
|
75 |
96" Sewer Channel Opening, November 27, 1906 |
|
76 |
Machine Shop and Boiler Repair Shop from S.E. Corner--Steel Work Erected, December 19, 1906 |
|
77 |
Machine Shop and Boiler Repair Shop- -Work Erected, December 19, 1906 |
|
78 |
Foundations for Ore Bins With Skip Tank Sec. #9 Furnace, December 19, 1906 |
|
79 |
Open Hearth #4, December 19, 1906 |
|
80 |
Housing Construction, Harrison North from 7th Avenue, December 19, 1906 |
|
82 |
Laying Sewer Pipe in Alley 4, December 19, 1906 |
|
83 |
Building Stoves to Furnaces #9 and #10--Bottom Courses, December 19, 1906 |
|
84 |
Foundation for Stores to Furnaces #11 and #12, December 19, 1906 |
| 100 |
86 |
Stoves for Furnaces #9 and #19, Lower Courses, December 31, 1906 |
|
87 |
Laying Water Pipe in Alley 5, South from 7th Avenue, December 31, 1906 |
|
88 |
Open Hearth Foundation form South, December 31, 1906 |
|
89 |
96" Sewer Looking North (Excavation), Town, December 31, 1906 |
|
90 |
Base of (6" Sewer Looking South from Channel Opening, December 31, 1906 |
|
91 |
Machine and Boiler Shops. Steel Work Erected and Roofing and Setting of Windows Commenced, December 31, 1906 |
|
92 |
Excavation for Electric Station, December 31, 1906 |
|
93 |
Maryland Street Looking North, December 31, 1906 |
|
94 |
Town, Seventh Avenue, Looking Across Broadway, December 31, 1906 |
|
- |
Indiana Steel Co., Gary, Indiana, " The Bridge" Across Which No Guilty Man May Pass, January 8, 1907 |
|
96 |
Stoves of Furnaces #9 and #10. Skip Tank #9, and Ore Bins 5 and 6 Courses On. (Foundation), January 17, 1907 |
|
97 |
Pumping Station Foundation, January 17, 1907 |
|
98 |
Laying Concrete for Electric Station (Foundation), January 17, 1907 |
|
99 |
Excavation for Blowing Engine House. Blast Furnaces, 9-12, January 17, 1907 |
|
101 |
Town, Bulkhead End of 96" Sewer Showing Sump and Wings, January 17, 1907 |
| 100 |
102 |
Harrison Street Looking North from 8th Avenue, January 17, 1907 |
|
102-G |
Coal Storage, 128 Cars-5626 Tons, June 3, 1918 |
|
104 |
General Office Building, February 2, 1907 |
|
105 |
Foundation of Stoves for Furnaces #11 and #12 Showing Bed of Rails, February 2, 1907 |
|
106 |
Blast Furnace #9; Stoves for 9 and 10 and Skip Tank for 9, about 11 Courses Up, February 2, 1907 |
|
107 |
Machine, Boiler Repair, Blacksmith, and Carpenter Shops-Steel Work Finished and Some Roofing On, February 2, 1907 |
|
108 |
Town. 96" Sewer-Driving Piles Across L.S. and M.S. Right of Way, February 2, 1907 |
|
109 |
Skip Tank #10 and Ore Bin Foundation. Brick Lining Fin. in Tank, February 2, 1907 |
|
110 |
Town, Boarding House from S.E. Corner of 6th Avenue and Delaware. Framework Nearly Finished, February 2, 1907 |
|
111 |
Excavation for Open Hearth #3, February 15, 1907 |
|
112 |
Crib Work--Excavation for Intake to Pumping Station, February 15, 1907 |
| 100 |
114 |
Town, Excavation for 60" Sewer, February 15, 1907 |
|
115 |
Site of Slip, February 15, 1907 |
|
116 |
Excavation of Engine Blowing House; Furnaces 9, 10, 11, 12, February 15, 1907 |
|
117 |
Blast Furnace #9 and Stoves of #9 and 10. 14 Courses up, February 16, 1907 |
|
118 |
Town-96" Sewer Looking From a Point South of L.S. and M.S. Railway, February 15, 1907 |
|
118-G |
Locomotive No. 12, Order. Dept., American Bridge Co., Gary Plant, June 24, 1918 |
|
119 |
Town-Bulkhead End of 96" Sewer, February 15, 1907 |
|
120 |
Foundation of Electric Station, February 15, 1907 |
|
121 |
Furnace #9; Stoves for 9 and 10. Ore Bin Foundations, 15 Courses up, March 2, 1907 |
|
122 |
Excavation for Rail Mill. Portion of 40" Blooming Mill, March 3, 1907 |
|
123 |
Town-Site of Gas Plant-Town Site, March 2, 1907 |
|
124 |
Town-54" Sewer West from Maryland Street, March 2, 1907 |
| 100 |
125 |
Laying Concrete Intake Pumping Station, March 2, 1907 |
|
126 |
Excavation for Open Hearth #3, March 2, 1907 |
|
128 |
Concrete Pumping Station, March 15, 1907 |
|
131 |
Intake of the Pumping Station, Crib Work, March 15, 1907 |
|
133 |
Furnaces and Stoves #9 and #10, from West. Main Part of Stove Shells About Finished, March 15, 1907 |
|
134 |
Electric Station from North East Corner Foundation, March 15, 1907 |
|
135 |
Stoves of Furnaces #11 and #12. Bottom Courses, March 15, 1907 |
|
136 |
Sinking Shaft for Water Tunnel- Lakeshore, March 15, 1907 |
|
- |
Machine, Boiler Repair, and Blacksmith Shops, March 15, 1907 |
|
- |
Shacks Along River, March 15, 1907 (2 Views) |
| 100 |
137 |
Starting Iron Work on Open Hearth #4, Southeast Corner, April 3, 1907 |
|
139 |
Blast Furnaces #9 and #10 and Stoves. 6 Courses Up on Furnace. Shells and Domes on Stoves, April 3, 1907 |
|
140 |
Building Dock Piers. Sand Pump Working at Entrance, April 3, 1907 |
|
142 |
Laying Foundation 40" Blooming Mill, at Rail Mill, April 3, 1907 |
|
143 |
General Office Building. Brick Work Fin. Up to Gable, April 3, 1907 |
|
144 |
Concrete Foundation of Electric Station April 3, 1907 |
|
145 |
Laying Concrete Foundation-Blowing Engine Building, April 3, 1907
Broadway South form N.E. Corner of Sixth Avenue, April 3, 1907
Beginning Iron Work on Open Hearth No. 4, form S.W. Corner, April 3, 1907 |
|
146 |
Furnaces and Stoves #9 and #10 with #11 and #12 in Background. Galleries on Top of Stoves, April 18, 1907 |
|
147 |
Open Hearth #4 from S.W. Corner (one truss up), April 18, 1907 |
| 100 |
148 |
Intake to Pumping Station, April 18, 1907 (Crib Work) |
|
149 |
Section of Concrete Pier (Dock Wall), April 18, 1907 |
|
150 |
Stoves, Bottom Courses, and Furnaces #11 and #12, April 18, 1907 |
|
151 |
Pumping Station Showing Intake Openings, Foundation Walls Fin., April 18, 1907 |
|
152 |
Concrete Foundation of Electric Station form N.E. Corner, April 18, 1907 |
|
153 |
Laying Concrete, Blowing Engine Building, April 18, 1907 |
|
154 |
Laying Concrete, Retaining Wall, Ore Yard, April 18, 1907 |
|
155 |
96" Sewer, North form L.S. and M.S. Right of Way, May 2, 1907 |
|
156 |
|
|
157 |
Rail Mill Foundation, 40" Blooming Mill Section, May 2, 1907 |
|
158 |
Stoves and Furnaces #9 and # 10. Chimneys on 2 Stoves, May 2, 1907 |
|
160 |
Stoves and Furnaces #11 and #12; 3 to 7 Courses up on stoves, May 2, 1907 |
| 100 |
162 |
Electric Station Foundation, May 2, 1907 |
|
163 |
Boarding House, Delaware Avenue and Sixth Avenue, Plaster Put On, May 2, 1907 |
|
164 |
Laying 15" Water Main, 16 foot cut to Rail Mill, May 2, 1907 |
|
165 |
Blowing Engine House Foundation, Blast Furnaces 9, 10, 11, 12, May 2, 1907 |
|
168 |
Furnaces and Stoves 11 and 12 from S.W., 7-14 Courses up on Stoves, May 17, 1907 (2 views) |
|
169 |
Stoves and Furnaces #9 and #10 Showing Bustle Pipe and Hearth Jacket on #9 Furnace, May 17, 1907 |
|
170 |
Hot Blast Mains to Stoves, #9 Blast Furnace, May 17, 1907 |
|
171 |
West Ore Bridge Wall, May 17, 1907 |
| 100 |
172 |
Open Hearth #4 from S.E. Corner (6 trusses up) May 17, 1907 |
|
173 |
Foundation of Electric Station from S.E. Corner, May 17, 1907 |
|
174 |
General Office Building, May 17, 1907 |
|
175 |
Dock Piers and Slip Entrance, May 17, 1907 |
|
176 |
|
|
178 |
Intake to Pumping Station, Placing Concrete, June 5, 1907 |
|
179 |
Concrete Sewer to Rail Mill, Crib Work, June 5, 1907 |
|
180 |
Blowing Engine House Foundation, June 5, 1907 |
|
181 |
Fill from Southeast N. of Main Office, June 5, 1907 |
|
- |
Stoves and Furnaces #9 and #10, June 5, 1907 |
|
182 |
Gleason Residence, n.d. |
|
184 |
Open Hearth #4. Eleven Trusses Up, June 5, 1907 |
|
185 |
Stoves and Furnaces #11 and #12. Columns and One Course Up on #11. 5- 14 Courses on Stoves. Dome on One, June 5, 1907 |
| 100 |
186 |
Starting Blast Furnace Trestle, June 5, 1907 |
|
187 |
Excavation for Open Hearth #3, June 5, 1907 |
|
188 |
Fill From Southeast Toward Blast Furnace Sewer, June 5, 1907 |
|
189 |
Starting Piling for Blast Furnace Trestle, June 17, 1907 |
|
190 |
C.P. Sta. Intake Under Ore Bin Foundation, June 17, 1907 |
|
191 |
Hearth Jacket, Furnace #9, June 17, 1907 |
|
192 |
Stores, Furnaces #9 and #10, June 17, 1907 |
|
193 |
East End of Intake at Slip, June 17, 1907 |
|
194 |
Fill N.E. Towards Blast Furnace Sewer, June 17, 1907 |
|
195 |
Open Hearth #4 (15 trusses up), June 17, 1907 |
|
196 |
Stoves and Furnaces. #11 and #12. 5 Courses Up on Furnace. #11, June 17, 1907 |
|
198 |
Stoves and Furnaces #9 and #10, Chimneys Up on All Stoves, June 17, 1907 |
| 100 |
199 |
Pumping Station, June 17, 1907 |
|
201 |
Broadway Looking North from Wabash Right of Way July 1, 1907 |
|
203 |
Intake Opening at Slip, July 1, 1907 |
|
204 |
Blast Furnaces and Stoves #11 and #12. Domes on 5 Stoves; 6 Courses on #11; Cols. up on #12, July 1, 1907 |
|
205 |
Electric Station. Engine Foundations, July 1, 1907 |
|
206 |
Stoves, Furnaces #11 and #12. B1. conn. on Stoves, July 1, 1907 |
|
207 |
Rail Mill Soaking Pit Foundation, July 1, 1907 |
|
209 |
Rail Mill 40" Blooming Section, July 1, 1907 |
|
210 |
Intersection of 5th and Broadway, July 1, 1907 |
|
- |
Blast Furnace Trestle, July 1, 1907 |
|
- |
Harbor and Slip, July 1, 1907 |
|
213 |
Open Hearth #4 South End. Cross Section, July 16, 1907 |
|
214 |
Open Hearth No. 4 from Northeast, Roof Partly On, July 16, 1907 |
| 100 |
215 |
Ore Unloader Wall, July 16, 1907 |
|
216 |
Trestle to Furnaces, July 16, 1907 |
|
217 |
Electric Station Engine Foundations, July 16, 1907 |
|
218 |
Site of Pig Machine and Ladle House, July 17, 1907 |
|
219 |
Intakes at Slip End, July 16, 1907 |
|
221 |
Stoves and Furnaces #11 and #12. 7 courses on #11, 5 courses on #12, Domes on All Stoves, July 16, 1907 |
|
222 |
Stoves and Furnaces #9 and #10. Chimneys on all 8 Stoves. Furnaces Shells up to Dome, July 16, 1907 |
|
223 |
Blast Furnace #9. Erecting Cast House Trusses, July 16, 1907 |
|
- |
Stoves and Furnaces 11 and 12, July 16, 1907 |
|
- |
Slip and Harbor |
|
224 |
Broadway North from 6th Avenue, August, 2, 1907 |
|
225 |
Stoves and Furnaces #9 and #10. Cast Houses Partly Erected, August 2, 1907 |
|
226 |
Slip and Harbor, August 2, 1907 |
|
227 |
Electric Station, Engine Foundation, August 2, 1907 |
|
228 |
Open Hearth No. 4 from Southwest, Struct. Work Nearly Finished, August 2, 1907 |
| 100 |
229 |
Ore Unloaders. Erecting One Machine. August 2, 1907 |
|
230 |
Soaking Pits and Rail Mill, 2 Trusses up, August 2, 1907 |
|
231 |
Stoves and Furnaces, Numbers 11 and 12. 7 Courses on #11. 6 Courses on #12. Cold and Hot Blast Pipes Party Up, August 2, 1907 |
|
232 |
Stoves for Furnaces #11 and #12 and Furnace #11. Cold and Hot Blast Pipes Partly Up, August 2, 1907 |
|
233 |
Blast Furnaces 9, 10, 11, and 12. View from Cast House Side, August 2, 1907 |
|
234 |
Intake at Slip End. Crib Work, August 20, 1907 |
|
235 |
Ore Bin Wall; Excavating South from Furnace No. 9, August 20, 1907 |
|
236 |
Blowing Engine House, Furnaces 9- 10-11-12. Engine Foundations, August 20, 1907 |
|
237 |
Stoves and Furnaces #11 and #12. Domes and Brackets on Furnaces H. and C. Blast Pipes Nearly Finished Chimneys on Four Stoves, August 20, 1907 |
|
238 |
Furnace #9 and Cast House, August 20, 1907 |
|
245 |
Slip and Harbor. Looking North, August 20, 1907 |
|
- |
Broadway North from L.S. and M.S. Depot, August 23, 1906 |
|
248 |
Open Hearth #3, September 10, 1907 |
|
249 |
Skip Tank #5 and Ore Bin Foundation, September 10, 1907 |
|
251 |
Blast Furnace Trestle from B. and O. Tracks, September 10, 1907 |
|
252 |
Soaking Pit and Rail Mill, September 10, 1907 |
|
253 |
Open Hearth #4, September 10, 1907 |
|
254 |
Ore Unloaders, September 10, 1907 |
|
255 |
Furnaces and Stoves #9 and #10, September 25, 1907 |
|
256 |
Furnaces and Stoves #11 and #12, September 10, 1907 |
|
258 |
Furnaces and Stoves #9 and #10, September 10, 1907 |
|
259 |
Furnaces and Stoves #11 and #12, September 25, 1907 |
|
260 |
Open Hearth #4 and Foundation #3, September 25, 1907 |
|
261 |
Site and Fill-Pig Machine and Ladle House, September 25, 1907 (to South) |
|
262 |
Dock Wall Continues South, September 25, 1907 |
|
263 |
Ore Unloaders, September 25, 1907 |
|
264 |
Rail Mill and Soaking Pit, September 25, 1907 |
|
265 |
Ore Bins, September 25, 1907 |
|
266 |
Open Hearth #4, September 25, 1907 |
|
267 |
Stoves and Furnace #11, September 25, 1907 |
|
268 |
North Section Blowing Engine House, September 25, 1907 |
|
269 |
Machine Shop, September 25, 1907 |
|
271 |
Mechanical Shop, September 6, 1907 |
|
273 |
Open Hearth #4, September 6, 1907 |
|
275 |
Slip and Harbor, #1 September 6, 1907 |
|
276 |
Electric Station, September 6, 1907 |
|
277 |
Site of Slip, Driving Posts, September 6, 1907 |
|
283 |
Slip and Harbor, September 6, 1907 |
|
285 |
Fill in, Looking toward Blast Furnace, September 6, 1907 |
|
287 |
Open Hearth #3, September 6, 1907 |
|
289, 291 |
Blast Furnaces #9, 10, 11, 12, September 6, 1907 |
|
293 |
Electric Station Blowing Engine House, September 6, 1907 |
|
295 |
Open Hearth #3 in Foreground and Open Hearth #4 in Background, September 6, 1907 |
|
297 |
Ore Bins and Foundation, September 6, 1907 |
|
299 |
Starting Iron Work of Rail Mill, September 6, 1907 |
|
- |
Stoves and Furnaces 11 and 12, September 25, 1907 |
|
- |
Broadway North from L.S. and M.S. Railway, September 25, 1907 |
|
300 |
Furnaces and stoves #9-2 and Ore Bins, October 8, 1907 |
|
301 |
Ore Bins, October 8, 1907 |
|
302 |
Furnaces and Stoves #9 and 10, October 8, 1907 |
|
303 |
Furnaces and Stoves #11 and 12, October 8, 1907 |
|
304 |
Ore Unloaders, October 8, 1907 |
|
305 |
Slip and Harbor, Under Construction Looking North, October 8, 1907 |
|
306 |
Electric Station form North, October 8, 1907 |
|
307 |
Blowing Engine House, October 8, 1907 |
|
308 |
Ore Bin Foundation and Skip #5 and 6, October 8, 1907 |
|
309 |
Fill Between Furnace Trestle and Sewer, October 8, 1907 |
|
310 |
Rail Mill and Soaking Pit, October 8, 1907 |
|
311 |
Open Hearth #4, October 8, 1907 |
|
312 |
Excavating for Electric Station, October 8, 1907 |
|
313 |
Open Hearth #3 and Gas Producer, October 8, 1907 |
|
314 |
Broadway Looking South From L.S. and M.S. R.R., October 8, 1907 |
|
315 |
Section Connecting Intake, October 9, 1907 |
|
316 |
Ore Yard, October 9, 1907 |
|
317 |
Jefferson School, October 9, 1907 |
|
319 |
Harrison Street, North from 8th Avenue, October 9, 1907 |
|
320 |
Furnaces and Stoves, #9, 10, and 11, October 9, 1907 |
|
322 |
Open Hearth #4, October 23, 1907 |
|
323 |
Electric Station, October 23, 1907 |
|
324 |
Blowing Engine House, October 23, 1907 |
|
325 |
Furnace #11, November 6, 1907 |
|
336 |
Furnaces and Stoves #9, 10, 11, and 12, Ore Bin Wall, November 6, 1907 |
|
337 |
Ore Unloaders, November 6, 1907 |
|
338 |
Open Hearth #4, November 6, 1907 |
|
339 |
Rail Mill and Soaking Pit Foundation, November 6, 1907 |
|
341 |
Electric Station, November 6, 1907 |
|
342 |
Skip Tank #5 and Bin Wall, November 6, 1907 |
|
343 |
Fill to N.E. towards Furnace Trestle, November 6, 1907 |
|
345 |
Bulkhead and Intake, November 19, 1907 |
|
347 |
O.H. #4, Foundation of #3, November 19, 1907 |
|
348 |
Ore Unloaders, 5 Under Construction, November 19, 1907 |
|
349 |
Electric Station, November 19, 1907 |
|
350 |
Rail Mill and Soaking Pit Foundation, November 19, 1907 |
|
351 |
Open Hearth #4, November 19, 1907 |
|
352 |
Blowing Engine House, November 19, 1907 |
|
354 |
Harbor and Slip, November 19, 1907 |
|
355 |
Furnace and Stoves #9, 10, 11, and 12 and Ore Bin Foundation, November 19, 1907 |
|
356 |
Stoves and Furnaces #11, November 19, 1907 |
|
357 |
Stoves #11, 12-Gas Washer, November 19, 1907 |
|
359 |
Stoves and Furnaces #11 and 12, November 19, 1907 |
|
360 |
Stoves and Dust Catcher to #10 Ore Bins, December 5, 1907 |
|
361 |
Furnace #11 and Dust Catcher, December 5, 1907 |
|
362 |
Stoves and Furnaces 11, 12, December 5, 1907 |
|
363 |
Gas Washer, Furnaces 11 and 12, December 5, 1907 |
|
364 |
Fill to N.E. Furnace Trestle and Sewer, December 5, 1907 |
|
365 |
Ore Unloaders and Bridge Wall, December 5, 1907 |
|
366 |
Electric Station, December 5, 1907 |
|
367 |
Excavation, Stoves and Furnaces 7 and 8, December 5, 1907 |
|
370 |
Open Hearth #3 and 4, December 5, 1907 |
|
372 |
Rail Mill, December 5, 1907 |
|
373 |
Open Hearth #4, December 5, 1907 |
|
374 |
Gas Washer Furnaces and stoves #11 and 12 from N.W., December 19, 1907 |
|
375 |
Gas Mains to Washer and Dust Catcher to Stoves #11 and 12, December 19, 1907 |
|
377 |
Gas Washer and Stove #11 and 12 from S.W., December 19, 1907 |
|
381 |
Ore Unloaders and East Bridge Wall, December 19, 1907 |
|
383 |
Slip and Harbor Under Construction, Looking North, December 19, 1907 |
|
386 |
Ore Bridge and Bins, January 7, 1908 |
|
387 |
Rail Mill and Soaking Pi, January 7, 1908 |
|
388 |
Open Hearths #3 and 4, January 7, 1908 |
|
389 |
Electric Station Extension, January 7, 1908 |
|
390 |
Foundation for Stoves and Furnaces #5 and 6, January 7, 1908 |
|
391 |
Gas Washer Stoves and ; Furnaces #1 and 12 from Top, January 7, 1908 |
|
392 |
Furnaces and Stoves #9, 10, 11, 12 Ore Bins and Bridges, January 7, 1908 |
|
393 |
Stoves #10 Dust Catchers #10 and 11, January 7, 1908 |
|
399 |
Dock Wall, January 15, 1908 |
|
401 |
Open Hearth #4 and Skull Crusher from North, January 15, 1908 |
|
407 |
Panorama Left to right, #2-4, January 1908 (2 views) |
|
408 |
Skull Cracker, February 6, 1908 |
|
409 |
Blowing Engine House, February 6, 1908 |
|
410 (x380) |
Crew of Merchant Mill, April 8, 1913 |
|
412 |
Open Hearth #3 and Producers and Stacks, February 6, 1908 |
|
413 |
Open Hearth #4, February 6, 1908 |
|
422 |
Slip and Harbor, February 23, 1908 |
|
423.5 |
Ore Bridges, February 23, 1908 |
|
424 |
Open Hearth #3 from North, February 23, 1908 |
|
425 |
Open Hearth #4-3 and Skull Crusher from N., February 23, 1908 |
|
426 |
Excavation Gas Supply Blooming Engine and Boiler House, February 23, 1908 |
|
447 |
Slip and Harbor, March 20, 1908 |
|
450 |
Open Hearth #3, March 20, 1908 |
|
451 |
Excavation Open Hearth #1, March 20, 1908 |
|
453 |
Excavation for Unloader Walls March 20, 1908 |
|
457 |
N.W. from Office Building, Panorama #1, March 25, 1908 |
|
458 |
Panorama #2, North from Office Building, March 25, 1908 |
|
462 |
Bridge to Works and Main Office Building, Panorama #1, March 25, 1908 |
|
465 |
Ore Bridges, March 25, 1908 |
|
488 |
Subway Between Office and Works, April 19, 1908 |
|
490 |
Slip an Harbor, Panorama #1-2, April 19, 1908 |
|
492 |
Open Hearth No. 3, May 9, 1908 |
|
493 |
Billet Mill, May 9, 1908 |
|
497 |
Open Hearth No. 3, May 9, 1908 |
|
498 |
Blowing Engine House and Gas Holder Foundation, May 9, 1908 |
|
502 |
Stove Foundations #7-8, May 23, 1908 |
|
504 |
Furnace #6, May 23, 1908 |
|
505 |
Stoves and Furnaces #5 and 6, May 23, 1908 |
|
506 |
Unloaders and Dock Walls, May 23, 1908 |
|
507 |
Unloader Wall Piling and Ore Yard, May 23, 1908 |
|
508 |
Open Hearth from North, May 23, 1908 |
|
- |
Accident at Bottom of Furnaces, May 23, 1908 |
|
512 |
Open Hearth #1, June 14, 1908 |
|
513 |
Billet Mill Foundation, June 14, 1908 |
|
514 |
Open Hearth #3 from Southeast, June 14, 1908 |
|
515 |
Foundation of Blowing Engine House for Furnaces 5, 6, 7, 8 and Electric Station Extension, June 14, 1908 |
|
517 |
Furnaces and Stoves #7 and 8, June 14, 1908 |
|
530 |
Broadway N. from L.S. and M.S. Tracks, June 30, 1908 |
|
548 |
Parade on Broadway After Arrival of First Ore Boat, July 23, 1908 |
|
569 |
Slip and Harbor through B. and O. Right of Way South Toward Turning Basin, August 22, 1908 |
|
612 |
General View N. of L.S. and M.S. Right of Way October 22, 1908 |
|
617 |
Jackson St. North from 7th Avenue, November 6, 1908 |
|
617-A |
N. in Jackson St. from 7th Avenue, Jefferson Park to Right, May 9, 1913 |
|
618-A |
North in Van Buren Street from 8th Avenue, May 9, 1913 |
|
619 |
Jackson Street N. form 8th Avenue, November 6, 1908 |
|
620 |
Broadway North from 8th Avenue, November 6, 1908 |
|
621 |
S.E. from Connecticut Street and 7th Avenue, November 6, 1908 |
|
622 |
Connecticut Street N. from 7th Avenue, November 6, 1908 |
|
623 |
Connecticut Street South from 7th Avenue, November 6, 1908 |
|
635 |
Fifth Avenue West from Massachusetts Street, Across Broadway, November 10, 1908 |
|
636 |
Fifth Avenue East from Washington Street Across Broadway, November 10, 1908 |
|
637 |
Panoramas of Turning Basin, #1-3, November 10, 1908 |
|
645 |
Secondary Gas Washer Furnaces #5 to 8, December 2, 1908 |
|
676 |
Time Recording Clock House, January 5, 1909 |
|
678 |
Office Building and Bridge-Main Entrance to Works, January 12, 1909 |
|
679 |
Panoramas of Gary, January 12, 1909 (4 views) |
|
680 |
Panoramas #1-4, Looking N.E. from 8th Avenue and Jackson Street, January 12, 1909 |
|
699 |
Open Hearth #1 from South End, February 22, 1909 |
|
711 |
Switchboard, Roughing Rolls, Rail Mill, March 1, 1909 |
|
712-13 |
Pulpit-Controller Board Rail Mills. Left Rolls, March 1, 1909 |
|
714 |
Starter to End Split Pole, Rotary Transformer, March 1, 1909 |
|
715 |
Exciter to Split Pole Rotary, March 1, 1909 |
|
716 |
Skip Incline, Dust Catcher and Furnace #8, March 12, 1909 |
|
717 |
Furnaces and Stoves #5 and 6, March 12, 1909 |
|
718 |
Furnaces and Stoves #7 and 8, March 12, 1909 |
|
719 |
Billet Mill from East End, March 12, 1909 |
|
721 |
Foundation Open Hearth #1. from the North End, March 12, 1909 |
|
722 |
Merchant Mill. 18" Mill from N.E. Corner, March 12, 1909 |
|
760 |
Gas Producer to Open Hearth Foundry, April 20, 1909 |
|
768 |
Open Hearth #1 Foundations, April 24, 1909 |
|
778 |
Furnaces, Stoves, Dust Catcher and Down Comer, #7 and 8, May 6, 1909 |
|
793 |
Hospital Building, May 17, 1909 (2 views) |
|
809 |
Hospital from Office Building, June 17, 1909 |
|
821 |
Municipal Building Town Site, July 8, 1909 |
|
827 |
Waterworks, July 8, 1909 |
|
828 |
Jefferson Street South from 3rd Avenue, Town Site, July 8, 1909 |
|
829 |
Broadway South from 3rd Avenue, Town Site, July 8, 1909 |
|
830 |
Broadway North from 9th Avenue, July 8, 1909 |
|
841 |
Hospital Building to Coke Ovens from West, August 8, 1909 |
|
847 |
Panorama #2, August 8, 1909 |
|
853 |
Office Building to Coke Ovens from West, August 8, 1909 |
|
855 (x314) |
Excavating for Coke Ovens Batteries, No, 3 and 5, November 17, 1912 |
|
858 |
Foundation for Office Building, Coke Ovens, August 21 |
|
884 (x320) |
Coke Ovens Battery Foundation, September 7, 1909 |
|
946 |
Hospital Building from Broadway, November 30, 1909 |
|
961.5 |
Hospital Building, December 18, 1909 |
|
1062.5 |
Union Depot L.S. and M.S. and B.O. Right of Ways, July 18, 1910 |
|
1064 |
Broadway Looking North from Wabash Right of Way, July 12, 1910 |
|
1066 |
General View-City Water Works, Tower, and Pump Station from Jackson Park, July 18, 1910 |
|
- |
Tennis Game, ca. 1910 |
|
1254 |
Site of Slabbing Mill from North, November 15, 1912 |
|
1255 |
Site of Slabbing Mill from South, November 15, 1912 |
|
1256 |
Slip and Harbor Plate #1-3, November 15, 1912 |
|
1257 |
Electric Station #1 from Southeast, June 30, 1913 |
|
1257A |
Broadway and 5th Avenue, Looking North, June 30, 1913 |
|
1258 |
Interior Electric Station #1 from South End, June 30, 1913 |
|
1258A |
Emerson School, June 30, 1913 |
|
1259 |
Outer breakwater and Lighthouse, June 30, 1913 |
|
1259A |
Proposed Y.M.C.A. Building, June 30, 1913 |
|
1261 |
Broadway Looking North from South of Fifth Avenue, June 30, 1913 |
|
1262 |
YMCA Building, June 30, 1913 |
|
1264 |
Emerson School, June 30, 1913 |
|
1265 |
Froebel School, Fifteenth Avenue, June 30, 1913 |
|
1267 |
Broadway Looking South from North of 5th Avenue, July 29, 1913 |
|
1268 |
5th Avenue East of Monroe Street, July 29, 1913 |
|
1269 |
Jackson Street South of 7th Avenue, July 29, 1913 |
|
1270 |
Jackson Street North of 7th Avenue, July 29, 1913 |
|
1272 |
Van Buren Street South of 7th Avenue, July 29, 1913 |
|
1273 |
View of Jefferson Park, Looking North and east, July 29, 1913 (2 views) |
|
1279 (x885) |
City of Gary, Van Buren Street North of 7th Avenue, July 29, 1913 |
|
1286 |
Paycheck-Ignatz Syaierski, December 9, 1911 |
|
1287 |
#3 B.E. House View Looking S.W. from |
|
1288 |
S.W. End of No. 10 Engine, February 21, 1912 |
|
1289 |
#3 B.E. House View from S.W. End #10 Engine, Looking N.E. Toward Air Compressors, February 21, 1912 |
|
1291 |
#3 B.E. House View from West End #7 Engine Looking North, February 21, 1912 |
|
1292 |
#B.E. House View from East End of North " Snow" Pump, Looking N.W., February 21, 1912 |
|
1297 |
#1 O.H. Heat of 28 Buggies on Machine, April 19, 1912 |
|
1304.5 |
Section of Scrap, 9 buggies #1 O.H., April 19, 1912 |
|
1305-06 |
O.H. #1, 1/2 Section of Scrap; 7 Buggies, April 19, 1912 |
|
1307(x212) |
Open Hearth #3, Heat of 17 Buggies, April 23, 1912 |
|
1309(x214) |
Open Hearth #4, Heat of 19 Buggies, April 23, 1912 |
|
1311(x216) |
Open Hearth #4, Cars of Tin Scrap in Stock Yard, Side View, April 23, 1912 |
|
1312(x217) |
O.H. #4 End View of Cars of Tin Scrap, April 23, 1912 |
|
1313(x218) |
O.H. #4 End View of Cars of Tin Scrap With Magnet Holding Load of Scrap Above Car, April 23, 1912 |
|
1316(x256) |
View Looking N.W. from Broadway Gate, October 8, 1912 |
|
1317(x256B) |
Office Building Looking N.W., 1912 |
|
1327(x237) |
Office Middle West Section of Map, August 2, 1912 |
|
1331(x244) |
Gary Works Baseball Team, September 14, 1912 |
|
1332(x244) |
Joliet Steel Ball Team, September 14, 1912 |
|
1336(x249) |
Ball Park Grand Stand and Field, October 2, 1912 |
|
1338 1/2(x258) |
Front View of Broadway Entrance, August 26, 1914 |
|
1340(x265) |
Chippers in Billet yard, September 24, 1913 |
|
1341(x267) |
#1 O.H. View of Iron Ladle Being Lifted from Truck to Mixer by Crane, October 16, 1912 |
|
1342(x268) |
Gen. View of Power Station Looking North End of #1 O.H. Scrap Trestle, October 16, 1912 |
|
1344(269) |
Gen. View of Exterior of Pig Machine, October 16, 1912 |
|
1347(x291) |
Gen. View of Interior of Roll Shop, Looking N.W., November 3, 1912 |
|
1348(x298) |
Gen. View of Interior of Machine Shop, Looking West, November 10, 1912 |
|
1349(x299) |
Gen. View Looking West of Tool Room in Machine Shop, November 10, 1912 |
|
1350(x300) |
Big Milling Machine in Machine Shop, November 10, 1912 |
|
1351(x300A) |
Big Milling Machine in Machine, November 10, 1912 |
|
1352(x301) |
Interior of Boiler Shop Looking West, November 10, 1912 |
|
1353(x302) |
General View of Blacksmith Shop Looking West, November 10, 1912 |
|
1354(x303) |
#1 Power Station. View from Crane Cab Looking N.W. Toward Foundation for 4 Gas Engines, November 19, 1912 |
|
1355(x304) |
#1 Power Station. View from Basement Level Looking N.W. Toward Foundation for Gas Engines, n.d. |
|
1358(x319) |
Docks. Excavating Harbor, November 17, 1912 |
|
1361(x331) |
Mill from North Balcony of Hospital, February 4, 1912 |
|
1361A(x331A) |
Mill from North Balcony of Hospital, February 4, 1912 |
|
1361B(x331B) |
Mill from North Balcony of Hospital, February 4, 1912 |
|
1362(x332) |
Transfer Car Receiving an Oven of Coke That is Being Pushed, September 25, 1913 |
|
1363(x333) |
Pusher Ready to Push Oven of Coke, December 28, 1913 |
|
1364(x334) |
Coke Ovens. West Coal Bridge, December 28, 1913 |
|
1364a(x334A) |
Coke Ovens. West Coal Bridge, December 28, 1913 |
|
1366(x317) |
Docks. Excavating East End of Intake, November 17, 1912 |
|
1367(x315) |
Excavating for 2 and 3 Power Stations, November 17, 1912 |
|
1368(x313) |
#12 Blast Furnace on Lake Shore, November 17, 1912 |
|
1369(x312) |
5th and Broadway, 1906 (Reproduction) |
|
1370(x311) |
Grading at Coke Plant (Reproduction, November 17, 1912) |
Boxes 104-106
| Box |
Photo Number |
Description |
| 104 |
1371(x305) |
#1 Power Station. View from Ground Level Looking N. Toward Engine Foundation, November 19, 1912 |
|
1372(x306) |
Launch Moored in Slip, Looking North, November 19, 1912 |
|
1373(x259) |
View of Hospital, October 14, 1912 |
|
1374(x336) |
Quenching Car of Coke at #4 Station. Coke Ovens, December 28, 1912 |
|
1375(x332A) |
Quenching Car of Coke at #4 Station. Coke Ovens, December 28, 1912 |
|
1376(x309) |
Reproduction, 1st Ore Boat Coming into Gary Harbor, November 17, 1912 |
|
1377(x307) |
Launch in Slip, Looking N.E., November 15, 1912 |
|
1378(x335) |
Coke Plant. #4 Screening Station and Quencher, December 28, 1912 |
|
1379(x338) |
Coke Ovens. Tanks. December 28, 1912 |
|
1380(x337) |
Coke Ovens. General View of Coke Ovens from Screening Station #2, December 28, 1912 |
|
1382(x304A) |
#1 Power Station. View from Basement Level Looking N.W. Toward Foundation for So. Gas Engines, November 19, 1912 |
|
1383(x305A) |
#1 Power Station. View from Ground Level Looking N. Toward Engine Foundation, November 19, 1912 |
|
1384(x303) |
#1 Power Station-View from Crane Lab Looking N.W. Toward Foundations for 4 Gas Engines, November 5, 1912 |
|
1385(x339) |
Coke Ovens. Interior of booster Station, December 28, 1912 |
|
1386(x343) |
Coke Ovens. Lorry car on 35 Battery, December 28, 1912 |
|
1387(x344) |
E.J. and E. Coaling Station Yard. View Looking N.W. at Cinder Pit, January 1, 1913 |
|
1388(x345) |
E.J. and E. Cooling Station Yard. View Looking N.E. at Cinder Pit, January 1, 1913 |
|
1389(x346) |
Kirk Yard. View Looking N.E. at Cinder Pit, January 1, 1913 |
|
1390(x174) |
Ore Yard and Unloading Pits, December 9, 1911 |
|
1392(x348) |
Group of Superintendents in Mr. Gleason's Office, January 11, 1913 (Reproduction) |
|
1393(x349) |
Interior Electric Shop, January 19, 1913 |
|
1395(x360) |
Coke Plant View Looking West from North End of Tracks, February 17, 1913 |
|
1396(x361) |
Coke Plant View Looking N.W. from Coal Bridge at East End of Tracks, February 17, 1913 |
|
1397(x361A) |
Coke Plant View Looking North from Coal Bridge at East End of Tracks, February 17, 1913 |
|
1398(x361b) |
Coke Plant View Looking N.E. from Coal Bridge at East End of Tracks, February 17, 1913 |
|
1401(364) |
Coke Plant Switchboard in Transformer Station, February 17, 1913 |
|
1402(x365) |
Coke Plant Transformers in Transformer Station, February 17, 1913 |
|
1403(x373) |
#3 O.H. View Looking North Toward #2 Pit Crane from Bridge of # Pit Crane, March 28, 1913 |
|
1404(x374) |
Blast Furnace View Looking East Toward West Side of #6 Blast Furnace Dust Catcher, Showing Position Where Man Operates Dust Catcher Valve, April 3, 1913 |
|
1405(x375) |
Blast Furnace View Looking North Toward #6 B.F. Dust Catcher, Showing Spout for Directing Flow of Dust into Car, April 3, 1913 |
|
1407(x377) |
Blast Furnace Looking North Toward Flue Dust Bins on B.D. Stock Trestle Showing Spray Wetting Down Dust, April 3, 1913 |
|
1408(x378) |
Physical Testing Laboratory View of Milling Machine Cutting Test Pieces, April 14, 1913 |
|
1409(x379) |
Physical Testing Lab. View of Milling Machine With Test Piece Vise Being Reversed, April 4, 1913 |
|
1411(x384) |
Roll Shop Looking N.W. at Big roll Lathe Showing Gear Guards Removed, April 3, 1913 |
|
1412(x385) |
Roll Shop, Looking N.E. at Large Lathe Showing Gear Guards Removed, April 13, 1913 |
|
1413(x386) |
Roll Shop, Looking N.W. Showing Gear Grounds Removed, April 13, 1913 |
|
1414(x387) |
Blast Furnace Looking Towards Flue Dust Pocket (right) and Ore Pocket (left) at #7 Blast Furnace, Stock House Shows Plate Cutting Down Opening to Bottom of Bin, April 16, 1913 |
|
1415(x388) |
Blast Furnaces. View of Lorry Car and Crew in Blast Furnace Stockhouse, April 16, 1913 |
|
1416(x389) |
Looking N.W. Toward Cars of Flue Dust Being Wet Down by Spray at #5 and 6 Blast Furnaces, April 16, 1913 |
|
1417(x390) |
Blast Furnaces. Bottom of #6 Furnace Dust Catcher Showing Spout in Position to Direct Dust into Car, April 19, 1913 |
|
1418(x393) |
Shops. Tug-of-War Between Boiler Shop and Electric Repair Shop, April 19, 1913 |
|
1419(x394) |
Merchant Mills View from Car Looking South Showing Interior of Merchant Mill Warehouse, April 23, 1913 |
|
1420(x395) |
Merchant Mill View of Car in N.W. Corner of Merchant Mill Warehouse Showing Interior, April 23, 1913 |
|
1421(x396) |
Blacksmith Shop. Largest Hook Ever Forged in B.S., Weight 900 lbs. for Open Hearth Ladle Crane, April 23, 1913 |
|
1422(x403) |
View from Axle Mill Coal Trestle Looking N.E. showing General View of Yard, April 23, 1913 |
|
1423(x404) |
Axle Yard. Comparison Picture to #1422. View Looking S.E., April 23, 1913 |
|
1424(x405) |
Locomotive Repair Shop. View Looking N.E. at Machines, April 23, 1913 |
|
1425(x406) |
Locomotive Repair Shop. View Looking N.E. at Machines, April 23, 1913 |
|
1426(x408) |
Slab Mill View Looking N.W. Toward Slab Mill Foundation, April 23, 1913 |
|
1427(409) |
Slab Mill. Comparison Picture to #1426. View Looking N.W. at Slab Mill Foundation, April 23, 1913 |
|
1428(x410) |
Blast Furnace. View from Middle Platform Over West Track of #1 Ore Bridge Looking N.W. Toward Back Side of Blast Furnace, April 30, 1913 |
|
1429(x411) |
Blast Furnace View from East Track of # Ore Bridge Looking N.W. Toward Back Side of Blast Furnaces, April 30, 1913 |
|
1430(412) |
Blast Furnaces. View from Yard Looking N.E. at Front Side of Blast Furnace, April 30, 1913 |
|
1431(x416) |
Coke Plant. Gen. View Looking East from Coke Plant Pumping Station, May 6, 1913 |
|
1432(x418) |
Docks. View on Deck of Shop " Harry Coalby" Looking North at Unloaders Working, May 6, 1913 |
|
1433(x419) |
Gas Engines. View Looking N.E. at Exterior of #2 and #3 Power Station, May 6, 1913 |
|
1434(x420) |
Rail Mill. View from Recorder's Office at East End of Mill, Looking N.W. at Mill Interior, May 6, 1913 |
|
1435(x421) |
Rail Mill. View from West Track of Pit Crane Looking West at Interior of Mill, n.d. |
|
1436(x422) |
Docks. View from S.W. Corner Turning Basin Looking Toward Steamer " Filbert" Leaving Basin, May 20, 1913 |
|
1437(x423) |
View Looking N.E. Toward Hospital from E.J. and E. Highline, 300 ft. East of Broadway, May 21, 1913 |
|
1439(x425) |
View Looking N.E. from E.J. and E. Highline at Bridge Over Broadway, May 21, 1913 |
|
1441(x427) |
View Looking N. from Broadway Bridge of E.J. and E. Highline Showing Men Coming from Mill at Noon, May 21, 1913 |
|
1442(x428) |
Ladle Repair Shop. View from Ladle Repair Crane Looking North Showing Flight of Piece of Scrap from Drop to Doorway of Ladle Repair Toolroom, May 18, 1913 |
|
1443(x429) |
Ladle Repair Shop. View Looking North into South End of Ladle Repair Shop Showing Piece of Scrap Stock on Panel of Door, Also Two Other Pieces Laying on Casting, May 28, 1913 |
|
1444(x430) |
Stores, Front View of Electric Controllers, May 28, 1913 |
|
1445(x431) |
Stores. 3/4 View of Electric Controllers, May 28, 1913 |
|
1446(x432) |
Coke Ovens. 3/4 View of " Connelly" Regulator, May 31, 1913 |
|
1447(x433) |
Coke Ovens. Front View of " Connelly" Regulator, May 31, 1913 |
|
1448(x434) |
Start of Gary-Indiana Harbor Game, Sunday, June 1, 1913. Looking N.W., E.J. and E. Highline, June 1, 1913 |
|
1449(x435A) |
Ball Park. Gessman Sliding Home. 1st Inning, June 12, 1913 |
|
1458(x435-g) |
Mountain at Bat, June 12, 1913 |
|
1461(x438) |
Plate Mill, View Looking N.E. Toward South Side of Top Penion, June 24, 1913 |
|
1462(x439) |
Plate Mill. View Looking S.E. Toward North Side of Top Penion, June 24, 1913 |
|
1463(x440) |
View Looking East Toward Middle Penion and Bearing, June 24, 1913 |
|
1464(x441) |
Plate Mill. View Looking N.E. Toward South side of Middle Penion, June 24, 1913 |
|
1465(x442) |
Plate Mill, View Looking East Toward North Side of Middle Penion, June 24, 1913 |
|
1466(x443) |
Plate Mill. View Looking East Toward End of Bottom Penion and Bearing, June 24, 1913 |
|
1467(x444) |
Plate Mill. View Looking N.E. Toward South Side of Bottom Penion, June 24, 1913 |
|
1469(x446) |
Billet Mill. View Looking into Bad End of Coupling Box, June 24, 1913 |
|
1470(x447) |
Billet Mill. View Looking into Good End of Coupling Box, June 24, 1913 |
|
1471(x448) |
Billet Mill. View Looking Toward End of Coupling, June 24, 1913 |
|
1472(x449) |
Billet Mill. 3/4 View of Coupling, June 24, 1913 |
|
1473(x450) |
View from South End of #1 O.H. Refractory Plant, June 24, 1913 |
|
1475(x452) |
Kirk Yards. 3/4 View of Car Wrecked at Buffington, July 2, 1913 |
|
1478(x454) |
3/4 View of Loaded O.H. Hot Lump Car, July 10, 1913 |
|
1479(x455) |
3/4 View of Car for Transferring Iron Ladle, July 10, 1913 |
|
1482(x458) |
Loaded stake Car for Sheet Bar, July 10, 1913 |
|
1483(x459) |
Cradle Car Used for Receiving Billets at Hot Bed Billet Mill, July 10, 1913 |
|
1484(x460) |
Broadway Gate, View From Front Steps of General Office Building, Looking S.E. Toward Bridge Showing Men Coming To Work, July 10, 1913 |
|
1485(x462) |
Rail Mill. View Looking East. Interior of North Motor Room, July 25, 1913 |
|
1486(x463) |
View of Ingot car Receiving Ingot from Pit Crane, July 25, 1913 |
|
1488(x465) |
Physical Lab. View Looking N.E. Toward Exterior of Physical Lab. Showing Flower Beds, July 29, 1913 |
|
1489(x466) |
Shipping Office View of Exterior Showing Grass Plot, July 29, 1913 |
|
1490(x467) |
Roll Shop. Gen. View Looking East at Roll Yard, July 29, 1913 |
|
1491(x468) |
Main Gate. View from Broadway Bridge Looking North Toward General Office Building, August 1, 1913 |
|
1493(x470) |
Broadway Gate, View Looking N.W. Toward Gen. Office Building and Tennis Court and Subway, August 1, 1913 |
|
1494(x471) |
Broadway Gate. View from Wire Tower N. of Pay station Looking South Toward Broadway and General Office Building, August 1, 1913 |
|
1495(x472) |
Broadway Gate. View from Wire Tower N. of Pay Station Looking Southwest Toward Gen. Office Bldg. and Tennis Court, August 1, 1913 |
|
1496(x473) |
Broadway Gate. View from Wire Tower N. of Pay Station Looking N. Toward Shop Street, August 1, 1913 |
|
1497(x474) |
Slab Mill. Two Low Cranes Lifting 25 Ton Girdles, August 5, 1913 |
|
1499(x476) |
Mason Offices. View Looking N.W. Toward Flower Beds, August 5, 1913 |
|
1500(x477) |
Locomotive Repair Shop. View of Flower Bed at S.E. Corner, August, 1913 |
|
1501(x478) |
Merchant Mill. General View of Interior #1-12, Merchant Mill Looking East, August 15, 1913 |
|
1506(x485) |
Coke Ovens, View Looking East Toward C.P. Office and Flower Beds, August 20, 1913 |
|
1508(x486) |
Fish Caught By Chief Bowser, August 27, 1913 |
|
1510(x488) |
East of Slip. Views Looking S.W. at Three West Cottages, August 29, 1913 |
|
1512(x491) |
View Looking S.E. at 4th, 5th, 6th, and 7th Cottages from West, Showing Keepers House in Rear of 6 Cottage, August 29, 1913 |
|
1513(x492) |
View Looking S.W. at Mess House, August 29, 1913 |
|
1515(x496) |
View of Electrical Dept. Champion Track Team, September 4, 1913 |
|
1517(x495) |
View of Electrical Dept. Champion Track Team, September 4, 1913 |
|
1522(x508) |
West Gate to Works, September 9, 1913 |
|
1527(x504) |
Chem. Lab. View of Exterior, September 13, 1913 |
|
1528(x505) |
#1 O.H. Hot Metal Transfer Car, September 13, 1913 |
|
1529(x506) |
Merchant Mill. J. Sweeney in Office, September 19, 1913 |
|
1530(x511) |
Coke Ovens. Coal Handling Dept.- Gen. View of Bldgs. Looking West from #1 Coal Bin, September 25, 1913 |
|
1531(x512) |
Coke Ovens. Gen. View of Coke Plant Looking N.W. from 21 Coal Bridge at East End of Storage Yard, September 25, 1913 |
|
1532(x513) |
Rail Mill. View of Raised Platform Around Drill Press Shield About Gaggers' Positions and Locations, September 28, 1913 |
|
1536(x518) |
Lake Dump. View of Bank 300 ft. West of Breakwater, November 11, 1913 |
|
1537(x519) |
Lake Dump Looking East from Middle of Slope, November 11, 1913 |
|
1538(x520) |
Lake Dump. Looking West from Bank, November 11, 1913 |
|
1540(x522) |
Lake Dump Looking West from End of Cinder Bank, November 11, 1913 |
|
1541(x523) |
Lake Dump. Wash Out on South Side of Cinder Bank, November 11, 1913 |
|
1542(x524) |
Lake Dump. View Looking toward Washout at West Wall of Slip of Ore Dock, November 12, 1913 |
| 105 |
1543(x525) |
Lake Dump. View Looking East Toward Same, November 12, 1913 |
|
1544(x526) |
Lake Dump. View from Entrance West End of Cinder Bank, Looking East, November 12, 1913 |
|
1545(x528) |
Axle Mill, View Looking East Toward Fan and Heat Coils of Heating System, December 10, 1913 |
|
1546(x527) |
Lake Dump. View on Top of West End of Cinder Bank Looking East Along Track, November 12, 1913 |
|
1547(x529) |
Axle Mill. View Looking West at Finishing End Showing Down Spouts of Heating System, December 10, 1913 |
|
1548(x53) |
Axle Mill. View Looking East at Heat Coils and Heating System, December 10, 1913 |
|
1549(x535) |
Axle Mill. Bathhouse. Exterior View Looking S.W., July 7, 1914 |
|
1550(x537) |
Axle Mill. Bathhouse Wash Bowls, January 7, 1914 |
|
1551(x538) |
Axle Mill. Washhouse Lockers, January 7, 1914 |
|
1552(x539) |
Stripper #3. Stripping a Heat, January 26, 1914 |
|
1553(x540) |
Plate Mill. Charging Crane Carrying Slab from Furnace, January 26, 1914 |
|
1554(x541) |
Plate Mill. Rolling a Plate, View Looking N.E., January 27, 1914 |
|
1557(x544) |
Coke Oven, View of Interior of B.P. Saturator Room Looking S. E., January 28, 1914 |
|
1564(x551) |
Slab Mill. View Looking West from Roller Table Toward Mill, February 28, 1914 |
|
1565(x552) |
Slab Mill. View Looking East Toward Mill, February 28, 1914 |
|
1566(x553) |
Slab Mill. View Looking N.E. Toward Roll Housing, February 28, 1914 |
|
1567(x554) |
Slab Mill. Gen. View of Interior of Mill Looking N.E. from Crane in S.W. Corner of Engine Room, February 28, 1914 |
|
1572(x559) |
View from 2nd Floor of Storehouse Looking West in Store Yard, April 27, 1914 |
|
1573(x560) |
View from West End of Store Yard Looking East, April 27, 1914 |
|
1574(x561) |
View Looking N.W. in West end Store Yard, April 27, 1914 |
|
1580(x567A) |
Ore Docks, Views Showing Condition of Ore Buffer Timbers Along West Wall Of Turning Basin from Mooring Post #4 to #12, May 8, 1914 |
|
1607(x595) |
Axle Mill Motor House, May 22, 1914 |
|
1610(x598) |
#3 Open Hearth Looking N.W. toward Flower Beds, June 8, 1914 |
|
1615(x603) |
Ball Park. View from Grandstand, June 9, 1914 |
|
1617(x605) |
Calvary Cemetery, East Gary. View Looking N.W. Toward Flowers on Mrs. J.J. Hennessey's Grave, June 5, 1914 |
|
1618(x606) |
Same as 1617, Looking West |
|
1619(x607) |
Ball Park. Blast Furnace Ball Team, June 8, 1914 |
|
1620(x608) |
Ball Park. East Mills Ball Team, June 16, 1914 |
|
1621(x609) |
North Stripper First 2 Ingots Poured for Slab Mill, June 16, 1914 |
|
1626(x614) |
Slab Mill. Looking East Toward Entering Table, June 27, 1914 |
|
1628(x616) |
Slab Mill Looking S.W. Toward Rolls, June 27, 1914 |
|
1629(x617) |
Slab Mill Looking S.E. Toward Rolls, June 27, 1914 |
|
1630(x618) |
Slab Mill Looking West from Roller Line Toward Sheer, June 27, 1914 |
|
1632(x610) |
Calumet River Looking West from Broadway Bridge, June 29, 1914 |
|
1633(x621) |
Calumet River Looking East from Broadway Bridge, June 29, 1914 |
|
1634(x622) |
Calumet River Looking West from Virginia Street, June 29, 1914 |
|
1635(x623) |
Same as 1634, Looking East |
|
1638(x626) |
Calumet River Looking East from South Bank of River Beneath E.J. and E. R.R. Bridge at Coke Plant, June 29, 1914 |
|
1641(x629) |
Calumet River. View on North Bank Looking West from 1st Bend in Start of New River, July 2, 1914 |
|
1642(x630) |
Calumet River Looking S.W. from Starting Point of New River, July 2, 1914 |
|
1644(x632) |
Slab Mill View Looking S.W. Toward Push All and Stop at Sheer Delivery Table, June 29, 1914 |
|
1648(x636) |
Gleason Park. Wrestling bout. Hagman on Top. Dinny Seneth Beneath, July 4, 1914 |
|
1649(x637) |
Gleason Park. Looking North Toward Grandstand, July 4, 1914 |
|
1651(x639) |
Calumet River. View Looking West from North Band 300 ft. West of Gen. Office Bldg., July 18, 1914 |
|
1652(x640) |
Calumet River. View Looking S.W. from North Band South of Roll Shop, July 8, 1914 |
|
1653(x641) |
Calumet River. Looking East from North Bank at south End of West Mill fence, July 8, 1914 |
|
1654(x642) |
Calumet River. View Looking South Toward Lakeshore from N. Band at S. End, July 8, 1914 |
|
1655(x643) |
Calumet River. View Looking East from E.J. and E. Highline South of W. End of Axle Mill, July 8, 1914 |
|
1670(x658) |
Bungalow, 704 Fillmore, Garden, July 29, 1914 |
|